• Mineral Processing EPCM+O
  • Xinhai globalization
  • Mineral Processing Solution

Mineral Processing EPCM+O

Mineral Processing Equipment

product icon

Mineral Processing Solution

New Energy

New Energy Mineral

Precious metal

Precious metal

Ferrous metal

Ferrous metal

Non-metal

Non-metal

Tailings Treatment

Tailings Treatment

Global Cases

  • Mexio 1200TPD Gold Mineral Processing Plant

    The 1200TPD gold mine cyanide concentrator project in Mexico is another collaboration between Xinhai Mining and the client of the project. In 2017, Xinhai Mining undertook the customer's 1,500tpd copper-lead-zinc, gold-silver polymetallic ore project in Mexico. Since the cooperation on the project was very pleasant and the project design overall met expectations. Therefore, the customer of this project once again chose to cooperate with Xinhai Mining during the preparation stage of the new project to help it complete the construction of the 1,200tpd gold ore cyanide concentrator project.

  • Hebei 2000TPD Iron Ore Concentrate Desulfurization Plant

    At the end of 2020, the customer of the 2000TPD iron concentrate desulfurization plant project contacted Xinhai Mining and stated that the iron concentrate produced by its project had a high sulfur content and was difficult to meet subsequent use needs. It hoped to obtain more qualified iron concentrate products through a new process plan. After a preliminary understanding of the project information, Xinhai Mining provided the customer with a rough technical plan and quotation. The customer was very satisfied with this and signed a follow-up project contract with Xinhai Mining. In 2022, the project undertaken by Xinhai Mining will be successfully constructed.

  • Malaysia 550TPD Lead-Zinc Ore Flotation Plant

    In 2022, the 550TPD lead-zinc ore flotation plant of Malaysian CNMC Company constructed by Xinhai Mining was successfully put into operation! As early as 2017, Xinhai Mining undertook the construction of the company's 700TPD gold mine CIL dressing plant project. The project took only 6 months from signing the agreement to putting into production, achieving a 95% gold recovery rate. This renewed cooperation with Malaysian CNMC will further promote Xinhai Mining’s EPCM+O services to penetrate into the Malaysian mining market.

  • Mongolia 2 Million TPA Gold Mineral Processing Plant

    The customer of the Mongolian gold mineral processing plant project was introduced to Xinhai Mining to inquire about the general contracting service of the dressing plant. They need to provide gold smelting construction engineering design, including: process expertise, civil engineering expertise, electric power expertise, water supply and drainage expertise, heating expertise, etc. After detailed communication, the customer learned about Xinhai Mining's high-efficiency and low-consumption analytical electrolysis system, affirmed Xinhai's equipment advantages, and successfully reached a cooperation agreement with Xinhai Mining to assist in the construction of the gold ore dressing plant project.