Guinea Gold Mine Project Installation

Xinhai Mining 3000TPD Gold Mine CIP Project in Guinea Was Successfully Put Into Operation

2024-03-22 XinHai Views (84)

If you want to know more information, like quotation, products, solutions, etc., please contact us online.

Optimal Solutions for Your Mine! Xinhai Mining has always adhered to the customer-first service concept and provided EPCM+O Service to global customers! Recently, the Guinea 3000TPD gold mine CIP plant built by Xinhai Mining was officially put into operation. During the construction of the dressing plant, Xinhai technicians always maintained professional technical standards and high service enthusiasm from design to construction, completed every task conscientiously, and successfully promoted project implementation.

Thanks letter from customer

(Thanks letter from customer)

Use the table of contents below to navigate through the guide:

01Project overview

Panorama of Guinea 3000 TPD Gold Mine Project

(Panorama of Guinea 3000 TPD Gold Mine Project)

Project location: Guinea, Africa

Raw ore composition: The gold deposit is mainly a surface laterite ore body, 80% of the ore is powdery clay ore, containing granular gold, the average grade of the ore is 1.0g/t, there are very few impurity elements, and gold is the only recoverable element.

Daily processing capacity: 3000 tons

Process flow: a section of closed-circuit grinding and classification—leaching operation—desorption electrolysis—smelting

Mineral processing equipment: ball mill, cyclone, chemical agitation tank, leaching tank, desorption electrolysis system, thickener, etc.

02Xinhai Solution


Mineral beneficiation test

Xinhai Minerals Comprehensive Utilization and Processing Test and Pilot Center

(Xinhai Minerals Comprehensive Utilization and Processing Test and Pilot Center)

Xinhai Mining received the gold mine sample from a customer in Guinea and immediately determined the composition of the sample. Xinhai Mining Research Institute then used innovative thinking to formulate a test plan for the gold mine sample, and finally selected an appropriate mineral processing process to improve the concentrate grade and recovery rate of the project.

Mineral processing design

Guinea Gold Mine Beneficiation Test

Based on the ore sample test results, Xinhai Mining Design Institute carried out design work for the gold mine project, including gold mine carbon slurry process design and related auxiliary facilities, involving mineral processing, water supply and drainage, electricity, civil engineering, general drawings, ventilation, HVAC and other majors. During the design process of the gold ore concentrator, Xinhai Mining equipment technicians conducted on-site inspections of the Guinea mining environment, planned and designed the concentrator according to local conditions, and developed a scientific and efficient gold mine production line after fully optimizing the design plan.

Equipment manufacturing and delivery

Guinea Gold Mine Project Equipment Production

Xinhai Mining provided a complete set of gold mining equipment for the 3000TPD gold mine carbon slurry project in Guinea, and provided customers with customized equipment based on the equipment selection of the mine design plan. Xinhai Mining has an intelligent high-end equipment production center. According to the production plan of the Guinea gold mine project, it completes the manufacturing of gold mining equipment on time and with high quality, and relies on a complete packaging and shipping management system and thoughtful and meticulous packaging and shipping services to ensure that the equipment arrive at the processing plant safely without damage.

Civil engineering installation and commissioning

Guinea Gold Mine Project Installation

Xinhai Mining Project Team provides services such as civil construction, installation and commissioning, and worker training for the 3000TPD gold mine carbon slurry project in Guinea. From the start of construction to the completion of the project, the Xinhai Mining Equipment Team participated in the construction of the gold mine project's main workshop, classification and gravity separation workshop, desorption electrolysis and carbon regeneration workshop, offices, and infrastructure such as water, electricity, and roads. At the same time, the overseas installation team also completed the installation and commissioning services of gold mining equipment on time and provided technical training for project workers to ensure the smooth launch of the project.

03Project Highlights


Automation design

automatic control of Guinea gold mining project

The 3000TPD gold mine carbon slurry project in Guinea adopts an intelligent control system for the entire mineral processing process. Xinhai Mining provides automated service solutions including automated design, automated equipment customization, intelligent control systems, and video surveillance systems. Each stage of the operation in the mineral processing plant realizes coordinated control and optimized control, and the production efficiency is significantly improved. The CNC system is paired with a video monitoring system to collect and control the output of production data. The screen is intuitive and the operation is convenient.

Steel structure factory building construction

Guinea Gold Mine Project Plant Construction

Based on the actual situation in Guinea, Xinhai Mining designed a combined steel structure mineral processing plant production line for the gold mine project, and designed and manufactured various reinforced concrete ore silos, pools, platforms, equipment supports, funnels, chutes, etc. above the surface. It is a combined steel structure that can be flexibly assembled at the mine site, reducing the civil work workload and construction time, and also saving construction investment costs.

Guinea Gold Mine CIP Project

During the construction of the 3000TPD gold mine CIP project in Guinea, Xinhai Mining used innovative thinking, professional technology, and enthusiastic service to win the reputation of customers! As the proposer and practitioner of EPCM+O Service, Xinhai Mining will continue to adhere to the customer-first service concept, provide high-quality products and high-quality services, and further enhance Xinhai Mining's market value, create more green and smart mines and help Xinhai Mining become a trusted partner for global customers!