This expansion added a second 4,000 t/d series to an operating 2,000 t/d gold plant in Xinjiang, lifting combined capacity to 2 Mt/a. Xinhai Mining supplied design, equipment and installation from the grinding circuit through dewatering, while the client retained the existing crushing system and had already completed the ore testwork.
Brownfield series integration: Added a new transfer belt and ore bin to feed the second series from the existing crushing system, then built a new grinding, flotation and dewatering train alongside the operating line.
Grinding and classification: Installed two MQYg3672 overflow ball mills in a one-stage grinding, two-stage closed-circuit arrangement, with cyclone underflow returning to the mills for a steady mill feed.
Large-scale flotation: Configured a single flotation circuit with one roughing, three scavenging and four cleaning stages using 12 × 50 m³ cells, with new rougher and scavenger machines and existing cleaners rebuilt for the duty.
Fiberglass belt guards: Replaced conventional steel belt guards on the flotation cells with fiberglass units, reducing weight and vibration while avoiding contact with the pulleys.
Concentrate dewatering: Raised the client's existing 18 m thickener by 1.5 m to serve both series, then added a hydraulic filter press for two-stage thickening and filtration of the gold concentrate.
Tailings and water recycling: Routed flotation tailings by gravity into the existing tailings dam and returned thickener overflow to the process-water circuit for reuse.
Construction drawings were submitted in March 2025, equipment shipped from March 2025 and installation ran from March to July 2025 across as many as five work fronts at peak. Most large equipment was shipped in sections and assembled on site, with mill transmission and cylinder aligned on centre lines and flotation cell surfaces levelled to tight tolerances. The plant is a benchmark project in northern Xinjiang that has drawn government visitors, and the completed expansion doubles the site's original grinding capacity within its existing footprint.