A new 500 t/d gold cyanidation plant was designed for the Asian Coordination Group's operation in Myanmar, with Xinhai responsible for the design and equipment supply and providing guidance during installation. The flowsheet was based on testwork that returned a 96.08% gold leaching rate, and the plant was laid out around a seven-tank agitated leaching circuit.
Crushing circuit: designed a two-and-a-half stage closed-circuit crushing flowsheet with jaw crushers and a cone crusher, producing a final product below 12 mm for the grinding circuit.
Grinding and classification: installed two stages of closed-circuit ball milling with a spiral classifier and cyclone group, reaching a final grind of 90% passing 200 mesh to liberate the fine-grained native gold.
Pre-leach thickening: placed a centre-drive thickener ahead of leaching to raise pulp density to the 40% required for the retention time in the leach circuit.
Agitated leaching: specified seven double-impeller leaching tanks with a 48-hour retention time, using mechanical agitation to keep the ore in contact with the cyanide solution through the full leaching period.
Carbon adsorption and gold recovery: included a 2,000 kg per batch elution and electrolysis unit with acid washing and carbon regeneration, closing the circuit from leach pulp to loaded carbon and gold product.
Installation support: supplied the equipment and sent personnel to guide installation, which was carried out by the client on the prepared flat site.
Bench testwork on the ore returned a gold leaching rate of 96.08% and a silver leaching rate of 66.38%, establishing the basis for the leaching conditions adopted in the design. Delivery and installation proceeded after the construction drawing package was completed, and the plant began running in December 2023. The client expressed appreciation for the design and equipment in a letter of thanks.