cases
A gold tailings reprocessing plant in Ghana treats 500 t/d of material grading 2–5 g/t Au through a carbon-in-leach circuit. Xinhai Mining provided process design, equipment and installation guidance for the greenfield plant, while the client installed the circuit with Xinhai supervision and operates the facility itself.
Layout with expansion reserve: Designed the 500 t/d plant to leave space in each workshop for a future expansion to 1,500 t/d, allowing the client to add capacity without relocating the processing circuit.
Tailings feeding and grinding: Fed the gold tailings directly into a two-stage closed-circuit grinding circuit without a crushing stage, producing pulp at 85% passing 200 mesh for leaching.
Pre-leach thickening and CIL: Thickened the ground pulp before cyanide leaching and carbon adsorption, improving gold recovery from the low-grade tailings feed.
Carbon recovery and refining: Passed loaded carbon through elution, electrowinning, acid washing and carbon regeneration before smelting, producing gold bullion on site.
Tailings and water management: Designed the tailings storage facility with its drainage system, tailings pumping station, pipeline and return-water pumping station, with three-waste treatment built into the layout.
Installation guidance: Supervised the client's installation team on site from May to September 2025, covering equipment placement and process piping through to completion of the line.
Construction drawing design was completed in December 2024 under a compressed schedule that ran from contract signature in July 2024. Equipment shipped in February 2025 and Xinhai's guidance team worked on site from May, completing installation guidance in September 2025. Built for 500 t/d with reserved space for 1,500 t/d, the plant gives the client a dedicated CIL route for recovering gold from purchased tailings, with wastewater, residue and exhaust treatment integrated into the design.