Zimbabwe 500tpd gold processing project is Xinhai mineral processing EPCM+O project. The mineral processing plant design includes the design of construction drawing for external processing of ore, including mineral processing, electric power, civil engineering, and general drawing.
Two-stage open circuit crushing - wet grinding - gravity separation process.
Jaw crusher was used for the first stage of crushing, and hammer crusher for the second stage. The crushing product is stored in the steel buffer bin through belt conveyor.
Then after the wet grinding of gold mill, the product separated in centrifugal concentrator.
The tailings pumped to thickener through slurry pump, and then dewatering in thickener.
After installation and commission, the project operated stable. The equipment quality is reliable. The mineral processing indexes and economy efficiency both reached the predicted indexes. Xinhai protected the profit of investors and tried to reduce the investment and increase efficiency. The stand-alone equipment and unit matched up, saving and high-efficiency. It realized the whole processing plant high-efficiency operating and the high-efficiency recovery of gold ores.