case

Mongolia 2 Million TPA Gold Mineral Processing Plant

The customer of the Mongolian gold mineral processing plant project was introduced to Xinhai Mining to inquire about the general contracting service of the dressing plant. They need to provide gold smelting construction engineering design, including: process expertise, civil engineering expertise, electric power expertise, water supply and drainage expertise, heating expertise, etc. After detailed communication, the customer learned about Xinhai Mining's high-efficiency and low-consumption analytical electrolysis system, affirmed Xinhai's equipment advantages, and successfully reached a cooperation agreement with Xinhai Mining to assist in the construction of the gold ore dressing plant project.

If you want to know more information, like quotation, products, solutions, etc., please contact us online.

Xinhai Solution

  • 01

    Xinhai Mining Design Institute combined the overall situation of the gold mine project and carried out a comprehensive gold smelting construction engineering design for the mine after multiple on-site inspections. Xinhai Mining has designed a gold ore heap leaching process for this mineral processing plant, which has a simple process and low investment costs.

  • 02

    Xinhai Mechanical Design and Research Institute tailor-made gold ore beneficiation equipment for customers based on project design requirements, and carried out technical transformation of common equipment to reduce energy consumption as much as possible, improve efficiency, and at the same time improve the quality of concentrate recovery to ensure the project Investment income.

  • 03

    Xinhai Mining's installation and commissioning team overcame difficulties and arrived at the gold mine project site as soon as possible to participate in and manage the equipment installation and commissioning of the project and provided professional maintenance and training services.

Project Result

The entire gold mineral processing plant project has high construction efficiency, short construction period and rapid production. The plant has reached the target, and the entire project is running efficiently and stably. Mongolia 2 million TPA gold ore dressing plant project was successfully put into operation, which is the customer's full recognition of Xinhai Mining's professional strength. It is also another success of Xinhai Mining EPCM+O case.

PROJECT SITE