news

news

Malaysia CNMC 700TPD Gold Project

2024-06-13 Views (786)

If you want to know more information, like quotation, products, solutions, etc., please contact us online.

Ore properties: The metal mineral of this project was mainly pyrite. The non-metallic minerals were quartz, calcite, mica. The raw ore contained 4.70g/t of gold, 4.63g/t of silver, 20.10% of iron and 20.55% of sulfur.

Xinhai Solution: Two stages closed circuit grinding - thickening before leaching - leaching andadsorption - tailings dry stacking

Project Results:Malaysia CNMC 700TPD Gold Project was put into operation in just 6 months. The actual capacity and recovery reached up to 700t/d and 95% respectively, 100t/d and 2 percentage points higher than the original targets. As a result, better economic benefits were achieved. 

RELATED VIDEOS

RELATED PRODUCTS

RELATED NEWS

Contact Us

Share your project details and our engineers will get back to you shortly.

  • Please fill in the Inquiry Type

    • Mineral Processing TestWork
    • Feasibility Study
    • Detailed Engineering Design (Mining / Processing / Tailings)
    • Mining EPC / Contract Mining
    • Mineral Processing EPC (Including Plant Upgrades)
    • Contract Mining Operation & Management
    • Tailings Dry Stacking System
    • Complete Mineral Processing Plant / Equipment Package
    • Other Inquiry
  • Please fill in the Mineral Type

    • Gold
    • Silver
    • Copper
    • Iron
    • Lead
    • Zinc
    • Molybdenum
    • Chrome
    • Manganese
    • Nickel
    • Tin
    • Wolfram
    • Antimony
    • Barite
    • Fluorite
    • Feldspar
    • Graphite
    • Zircon
    • Lithium
    • Quartz
    • Others
  • PDF / DOC / JPG / DWG / XLS
  • Providing more project details will help us deliver a faster and more accurate technical solution.

    We respect your privacy. Your information will be kept strictly confidential.