case banner
  • Inner Mongolia 1200t/d Manganese and Silver Wet Leaching Concentrator Project

    Ore: Multi-Metal

    Capacity: 1000-3000TPD

    Process: Three stage and one closed circuit crushing and screening – two stage closed circuit grinding – SO2 manganese leaching - cyanidation leaching silver in full wet process.

  • Inner Mongolia Siziwangqi 660 tpd Fluorite Mineral Processing Plant

    Ore: Fluorite

    Capacity: 300-1000TPD

    Process: Two-stage and one closed-circuit crushing and screening-First full closed-circuit grinding(first grinding+second grading)-Desulfurization flotation-Fluorite flotation (one-roughing, two-scavenging, eight-concentration+concentration I re-grinding closed-circuit)-concentrate dehydration process.

  • Anhui 600t/d Iron Mineral Processing Plant

    Ore: Iron

    Capacity: 300-1000TPD

    Process: Stage grinding (two-stage grinding) - stage separation (six-stage magnetic separation) - iron concentrates dehydration - gravity separation from magnetically separated tailings-regrinding - flotation separation process of sulfur and titanium.

  • Anhui 1000t/d Quartz Processing Plant Project

    Ore: Quartz Sand

    Capacity: 1000-3000TPD

    Process: Two-stage and one-half closed-circuit crushing and screening--one-stage closed-circuit grinding--desliming--magnetic separation--concentrate dwatering process.

  • Kyrgyzstan 4000tpd Gold Carbon-in-Pulp Processing Plant

    Ore: Gold

    Capacity: 3000-6000TPD

    Process: Carbon-in-pulp(CIP).

  • Hunan Luxixinfeng 600 tpd Phosphorite Mineral Processing Plant

    Ore: Phosphorite

    Capacity: 300-1000TPD

    Process: Two-stage and one closed-circuit crushing and screening - two-stage closed-circuit grinding - decarbonization flotation - one-roughing, one-scavenging, one-concentration positive flotation - one-roughing, two-scavenging reverse flotation + one-roughing, one-scavenging, one-concentration sulfur flotation - fine tailings dehydration process.

  • Iran 300tpd Chrome Processing Plant

    Ore: Chrome

    Capacity: 300-1000TPD

    Process: Two-stage closed-circuit crushing and screening-One-stage closed-circuit grinding and classification-Gravity concentration-Concentrates and tailings dewatering.

  • Guizhou 700t/d Gold Ore Tailings Dry Stacking Project

    Ore: Gold

    Capacity: 300-1000TPD

    Process: Thickener + filter press for gold dewatering process.