Ore: Gold
Capacity: 1000-3000TPD
Process: All-slime cyanidation process
Ore: Silver
Capacity: 300-1000TPD
Process: Two and a half stage close-circuit crushing - two-stage grinding - flotation (a roughing, three scavenging and two cleaning) - two-stage dewatering
Ore: Gold
Capacity: 300-1000TPD
Process: Two-stage closed-circuit crushing and screening - two-stage closed-circuit grinding - CIP - tailings dewatering by filter press - desorption electrolysis-smelting
Ore: Gold
Capacity: <300TPD
Process: Ore washing -crushing - grinding and classification - cyanide leaching
Ore: Gold
Capacity: <300TPD
Process: Two closed-circuit crushing - two closed-circuit grinding, classification - jigging - gold extraction by cyanidation - desorption electrolysis - smelting
Ore: Gold
Capacity: 300-1000TPD
Process: Pre-screening - one-stage closed-circuit grinding and classification - thickening - cyanide leaching - desorption electrolysis - smelting - tailings dewatering by filter press
Ore: Gold
Capacity: 300-1000TPD
Process: One-stage open-circuit crushing and classification - one-stage open-stage self-grinding - one-stage closed-circuit grinding and classification - flotation - concentrates dewatering
Ore: Iron
Capacity: 1000-3000TPD
Process: Two-stage closed-circuit crushing and screening - two-stage closed-circuit grinding and classification - magnetic separation process of one-stage roughing and three-stage concentration - concentrates and tailings filtering and dewatering