Guinea 15000TPD gold ore processing plant

Here Comes Projects Inventory of Xinhai Mining EPC in 2020

2021-01-11 XinHai Views (1976)

If you want to know more information, like quotation, products, solutions, etc., please contact us online.

Time engraves new rings and records the footprints that go ahead. In the extraordinary 2020, we faced difficulties, turned against the wind, and became more brave as we fought. The hardworking and brave people in Xinhai, still handed over a shining performance report.

Now, let’s take stock of some projects completed by Xinhai Mining in 2020.

01Guinea 15000TPD gold ore processing plant

Guinea 15000TPD gold ore processing plant

Ore properties

The ore of the project is mainly oxide ore. 80% of the ore is powdery clay ore, containing granular gold. The average ore grade is 1.0g/t, with very few impurities. Gold is the only recoverable element, and the ore is easy to select.

Xinhai solution

Heap leaching, desorption electrolysis process. Gravity separation + cyanide process

In 2018, the client of this project entrusted Xinhai Mining to provide “Turn-key Solution for Mineral Processing Plant (EPC+M+O)” for its 4000tpd gold ore processing plant. The project was designed at the beginning of 2018 and put into operation at the end of the year with a comprehensive gold recovery rate of about 90%. In 2019, the client of this project decided to expand the original 4000tpd gold processing plant, and expand the production capacity of the entire processing plant to 6000tpd on the original basis. Based on the successful production practice of the first phase, the client entrusted Xinhai Mining Equipment again to provide one-stop and customized Turn-key Solution for Mineral Processing Plant (EPC+M+O) for its 6000tpd gold processing plant project. Since the signing of the contract, it took only 8 months (including 2 months of transportation and customs clearance) for Xinhai Mining to realize the official commissioning of the gold ore project. The final comprehensive recovery rate reached 90%, and the economic benefits were considerable.

Since the 6,000tpd gold processing plant project in Guinea was successfully put into operation, this mining company of the project quickly started the construction of the 15000tpd gold ore project in 2019, and continued the chapter of cooperation with Xinhai Mining EPC for the third time. At present, the Guinea 15000tpd gold processing plant project has entered the final stage of installation and commissioning.

02Mongolia 5500TPD gold ore processing plant

Mongolia5500tpd gold ore processing plant Pic1

Ore properties

The grade of gold ore is 1.6g/t.

Xinhai solution

Heap leaching, desorption electrolysis.

Initially, the client of the project entrusted Xinhai Mining to carry out the design of the processing plant and gold smelting construction engineering design for it, involving processes, civil construction, electricity, water supply and drainage, heating and other aspects. Xinhai Mining Design Institute set up a special project team and handed over the complete plant design plan in only 3 months. The client was impressed by Xinhai Mining's technical strength and service attitude and then decided to start a more in-depth cooperation with Xinhai Mining.

Mongolia5500tpd gold ore processing plant Pic2

03Laos 2000TPD gold cyanide plant

Laos 2000TPD gold cyanide plant Pic 1

Ore properties

The raw ore of the project contains organic carbon and inorganic carbon, and the graphite content is 2%. Gold in the ore of the project is the only recyclable element.

Xinhai solution

All-slime cyanidation carbon-in-pulp (CIL) process

With the increase of mining depth, the property of the project's ore has changed greatly. The original flotation process is no longer suitable for the recovery of valuable elements in the ore. Therefore, the client of the project decided to carry out technical transformation of the original processing process. Through many inspections and comparisons, Xinhai Mining has been recognized by the client in terms of production technology and management, especially Xinhai Mining's unique “Turn-key Solution for Mineral Processing Plant (EPC+M+O)” model has completely solved the client' s previous problems and decided to cooperate with Xinhai Mining immediately.

In the process of plant design, Xinhai Mining added new equipment and process appropriately on the basis of the original flotation plant, utilized the existing plant, equipment and foundation as much as possible. Through scientific and reasonable design of the plant design, the entire processing plant and the old and new equipment were ensured to operate smoothly, which not only achieves the expected recovery rate, but also saves the investment cost. The final gold mine recovery rate was 87%-95%. The client was very satisfied with the results of this transformation!

Laos 2000TPD gold cyanide plant Pic2

04Tibet 1500TPD lead-zinc mine tailings dry discharge

Tibet 1500TPD lead-zinc mine tailings dry discharge Pic1

Ore properties

The average tailing concentration of the project is 28%. The tailing is fine, -200 mesh accounts for 65%, and the water content is 25~30%.

Xinhai solution

Hydrocyclone + dewatering screen + filter press dewatering process

The client of this project had contacted several companies at the beginning, and after repeated investigation and comparison, it was considered that Xinhai Mining's “Turn-key Solution for Mineral Processing Plant (EPC+M+O)” model had more competitive advantages. Its one-stop service “design and research - complete equipment manufacturing and procurement - commissioning and delivery - mine management - mine operation” ensures the win-win situation for both process plant and economic benefits, and effectively controls the overall progress, cost and quality of the project. The concentration of the tailings after processed was 80%, the return water rate was 92%, and the water content of the tailings after treatment was less than 20%.

Tibet 1500TPD lead-zinc mine tailings dry discharge Pic2

05Indonesia 700TPD gold ore processing plant

Indonesia 700TPD gold ore processing plant Pic1

Ore properties

Gold is the only recoverable element in the ore of the project, with a grade of 2.6g/t.

Xinhai solution

Crushing and washing - Pool leaching and adsorption - Desorption and electrolysis - Activated carbon pickling and regeneration - Smelting

At first, after the client of this project learned about Xinhai Mining's “Turn-key Solution for Mineral Processing Plant (EPC+M+O)”, they expressed their interest in this unique service model. The technicians of Xinhai Mining gave him a detailed introduction and proposed a general solution for the client in time according to the experience of the projects undertaken by Xinhai Mining in Indonesia in the past. The client said that the professional strength shown by Xinhai Mining had left a deep impression on him. Subsequently, the client visited Xinhai Mining and further understood the technical strength of Xinhai Mining and further strengthened the client's intention to choose Xinhai Mining. After many comparisons and considerations, the two sides successfully reached cooperation. In the final smelting process, gold ingots with a purity higher than 80% were obtained, and the actual recovery rate wa 85%.

It is worth affirming that Xinhai mining installation and commissioning personnel overcame a lot of difficulties during the epidemic, ensured their own safety while ensuring smooth project installation and commissioning, and successfully obtained gold during the epidemic, which deeply impressed the client with their high standard and high quality professional attitude.

Indonesia 700TPD gold ore processing plant Pic2

06Guizhou 700TPD gold ore tailings dry discharge

Guizhou 700TPD gold ore tailings dry discharge Pic1

Ore properties

The tailings are flotation tailings from the original gold flotation workshop.

Xinhai solution

Gold tailings for dewatering process of thickener + filter press

When designing, the tailings dry discharge workshop was closely connected with the original flotation workshop, and the topographical advantages of the industrial site were reasonably utilized for the process arrangement. In addition, for the property of the tailings of the project, Xinhai Mining adopted a new type of filter press for it, which greatly reduced the water content of the tailings.

Guizhou 700TPD gold ore tailings dry discharge Pic2

07Henan 650TPD gold ore processing plant

Henan 650TPD gold ore processing plant Pic1

Ore properties

The average grade of the raw ore of the project is more than 2g/t, which is a kind of gold ore of volcanic nature, difficult to grind and difficult to select.

Xinhai solution

Crushing-closed circuit grinding-flotation (one rough, three scavenging, four concentration)-concentrate dewatering process

The client of this project has tried to renovate the project twice, but the effect is not satisfactory. After that, the person in charge of the project found Xinhai Mining and entrusted Xinhai Mining Research Institute to conduct the processing test for him. Xinhai Mining Research Institute is unique in gold ore processing, and has valuable experience especially in the ore processing test research which is difficult to select. Through repeated tests, it was finally decided to adopt the crushing-closed circuit grinding-flotation (one rough, three scavenging, four concentration) - concentrate dewatering process. In addition, Xinhai Mining Design Institute redesigned the plant design and layout for the original processing plant, taking into account both aesthetics and efficiency, which became a typical local benchmark of modern processing plant in Henan.

Henan 650TPD gold ore processing plant Pic2

08Myanmar 500TPD copper ore processing plant

Myanmar 500TPD copper ore processing plant Pic1

Ore properties

The main metal minerals of the ore in the project are chalcopyrite, pyrite, etc., and gangue minerals include quartz, calcite, and mica minerals. The copper grade of the raw ore is 3.74%, the sulfur grade is 10.73%, and the iron grade is 13.71%.

Xinhai solution

One-stage crushing and screening-grinding classification-flotation (one roughing, two concentration, three scavenging) process.

Myanmar 500TPD copper ore processing plant Pic2

09Tanzania 500TPD gold ore processing plant

This project is a complete set of equipment production line undertaken by Xinhai Mining with a processing capacity of 500tpd. According to the detailed equipment process parameters and drawings provided by the client, Xinhai Mining has customized various equipment and auxiliary materials in the process of crushing and screening-grinding and grading-reagent preparation-floating separation-concentrate dewatering, and improved the equipment according to the design and process requirements.

Tanzania 500TPD gold ore processing plant Pic1

Tanzania 500TPD gold ore processing plant Pic2

010Henan 3000TPD gold ore processing plant

This project is a transformation project undertaken by Xinhai Mining. Xinhai Mining has customized a complete set of equipment in the gold flotation production line for this project, mainly including ball mills, flotation cells, thickeners, agitation tanks and other equipment and accessories. According to the original condition of the plant, the equipment is improved to make it conform to the process flow and plant foundation.

Henan 3000TPD gold ore processing plant Pic1

Henan 3000TPD gold ore processing plant Pic2

011Sichuan 1500TPD spodumene ore processing plant

This project is a transformation project undertaken by Xinhai Mining. According to the process parameters and drawings provided by the client, Xinhai Mining Equipment customized the main and auxiliary equipment in the grinding and flotation process for this project. The main equipment includes a wet energy-saving grid ball mill, belt feeder, belt conveyor, XCF/KYF air inflation floatation cells with double scrapers, XPA wear-resistant slurry pump, XCII classification wear-resistant hydrocyclone group, etc., used to process the spodumene. During the negotiation, Xinhai Mining impressed the client with reasonable technical improvement suggestions according to the site situation. In the design and production of equipment, Xinhai Mining Equipment improved the equipment according to the process characteristics to make it meet the process requirements of the project.

Sichuan 1500TPD spodumene ore processing plant Pic1

Sichuan 1500TPD spodumene ore processing plant Pic2

As the global epidemic is raging in 2020, Xinhai Mining has actively adopted various strategies to ensure the smooth progress of the processing plant projects as much as possible, and won many orders for Turn-key Solution for Mineral Processing Plant. In the new year, Xinhai Mining EPC will always maintain its original intention and try its best to provide sufficient guarantee for the promotion of processing plant projects around the world.